2003-11-19 Todo list……

2003-11-19 Todo list……

what's left to do….

spaceframe and rebuild front end (not a small job)
rebuild sills, A&B Pillars, Chassis legs and pedal box
build floor mounted pedal box
build rear arches
Finish exhaust tunnel
Paint underside of the car
Rebuild and refit subframe
Refit engine, build primaries, and finish exhaust
Remove and rebuild rear bulkhead
Fit 400 kit
Rebuild rear axle with LSD
Shorten Prop
Make new gearbox mount
Refit cable handbrake lever, and design and fit hydraulic handbrake lever
Replace sunroof with alloy plate
Figure out ventilation for cabin
Mince about.
Fit quickrack
Fit rear coilovers
Design build and fit front suspension (probably pushrod with coilovers in the engine bay)
Finish building V1 of the V6 (Headwork, flatter sump and some oil system revisions).
Finish building the TB system for the V6.
Plumb the brake and fuel systems
Find a decent radiator and fit it and some ducting to keep the hot air away from the engine.
Sort out the coolant plumbing.
Fit the disks and callipers (Rear will get 2 calipers per side, 1 for MOT handbrake, the other for driving use)
Rewire the car from scratch
Purchase ECU (DTA P8Pro), and finish wiring harness
Purchase and fit seats and harnesses
Fit Harness Bar to rollcage
Build dash
once it's all built up and running, then take it apart again and go for the full respray!
Mapping
Fit Traction control sensors

Leave a Reply